Digital Realty Dulles Expansion

Latest Podcast

Old Ox Rd

Under ConstructionPlanned

Multi-phase construction project

Digital Realty Dulles Expansion

Year Built: 2026

Lot Size: 424 acres

Sites on this Campus:

Digital Realty acquired the 424 acre parcel in September 2018 for $236.5 million from the Metropolitan Washington Airports Authority (MWAA).

The development plan features 11 super-sized data center buildings, ranging from 525,00 square feet to as much as 766,000 square feet.

Read more

Map and Nearby Locations:

Old Ox Rd

( Address is Approximate )

Digital Realty Trust Sites

Nearby Facilities

Click to see the map

Baxtel Sites

0 sites

×

No Baxtel sites in current view

Digital Realty Dulles Expansion Power Growth Over Time

Unlock full market data

Operational

Construction

Planned

Prospective

In Doubt

Withdrawn

Currently Operational

NN Request Dataset MW

across NN Request Dataset sites

Under Construction

NN Request Dataset MW

NN Request Dataset sites currently building

Planned / Prospective

NN Request Dataset MW

NN Request Dataset sites announced, but haven't started construction

Distance Site About
0.12 miles Digital Realty: IAD44 IAD44 is The first data center building located in the Dulles Campus of Northern Virginia.
0.46 miles Prologis: Sterling, VA In Sterling, Virginia, Prologis is seeking to rezone a 94-acre property comprised of three parcels on Pebble Run Place, Erins Run Drive, and Carters School Road.
0.53 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) Amazon's Erin's Run Campus consists of three data center buildings located at 23825 Erin's Run Dr, Sterling, VA, just west of Dulles International Airport.
0.57 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) The data center building IAD-121 is a part of Amazon's Erin's Run Campus. The Campus consists of three data center buildings located at 23825 Erin's Run Dr, Sterling, VA, just west of Dulles International Airport.
0.59 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) The data center building IAD-122 is a part of Amazon's Erin's Run Campus. The Campus consists of three data center buildings located at 23825 Erin's Run Dr, Sterling, VA, just west of Dulles International Airport.
0.71 miles CyrusOne: NVA9 Bldg 2 CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
0.89 miles CyrusOne Sterling IX CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
0.90 miles CyrusOne: NVA9 Bldg 1B CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
1.15 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
1.18 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
1.29 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
1.30 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
1.82 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
1.91 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
1.92 miles Stack: Loudoun 2 This facility is part of Stack's Loudoun County Campus is Virginia.
1.96 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
2.04 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
2.18 miles Stack: Loudoun County Campus Stack Infrastructure is further expanding in Virginia with a new 122-acre campus in Loudoun County, near Dulles Airport.
2.26 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) Real estate investment firm BlackChamber Group is planning to build a 1.7 million-square-foot (157,900 sqm) data center campus in Arcola, in Virginia’s Loudoun County.
2.28 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
2.48 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
2.48 miles 44351 Import Plz
2.48 miles Import Plz, Ashburn
2.49 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
2.53 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
2.54 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
2.57 miles QTS Ashburn-Shellhorn
2.65 miles QTS Ashburn-Shellhorn DC2
2.68 miles 44060 Digital Loudoun Plaza (Bldg K)
2.68 miles 43940 Digital Loudoun Plaza (Bldg G)
2.69 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
2.71 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
2.75 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
2.75 miles PowerHouse: Arcola Bldg B Sat on 23 acres in Arcola’s Arcola Boulevard, PowerHouse Arcola will comprise two two-story buildings and 12 data halls across 614,300 sq ft (57,070 sqm).
2.76 miles Digital Realty Loudoun Ashburn Campus The Digital Ashburn (Loudoun) Campus is 98 acres and consists of 9 datacenters. There are at least 37 suites within nine buildings on the Loudoun Exchange campus.
2.76 miles 44100 Digital Loudoun Plaza (Bldg J)
2.76 miles 43881 Devin Shafron (Bldg B)
2.76 miles 43780 Digital Loudoun Plaza (Bldg H)
2.77 miles Sentinel Washington Dulles Gateway Sentinel Data Centers acquired the 280-acre plot in Sterling Virginia for $82.5 million. As of July 2018 the land is undeveloped and Sentinel has not announced plans for the site.
2.77 miles Csquare: Dulles IAD3 Cyxtera's DC7 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink
2.79 miles 43831 Devin Shafron (Bldg C)
2.82 miles 43915 Devin Shafron (Bldg A)
2.82 miles PowerHouse Arcola Sat on 23 acres in Arcola’s Arcola Boulevard, PowerHouse Arcola will comprise two two-story buildings and 12 data halls across 614,300 sq ft (57,070 sqm).
2.82 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
2.82 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
2.83 miles 43791 Devin Shafron (Bldg D)
2.85 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) In July 2020, AWS proposed building 1.75 million square feet of data center space on the property.
2.87 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
2.88 miles QTS: ASH2 DC2 DC2 is the second building of Ashburn's Lockridge ASH2 Campus.
2.88 miles Skybox Northern Virginia Skybox NOVA is a ten-acre private campus with flexible configurations with 30 MW of power and 210,500 SF from 120-600 watts per square foot.
2.90 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
2.90 miles CloudHQ: LC4 CloudHQ's LC4 is a massive three-story data center spanning 1.4 million square feet. Located at 22210 Loudoun County Parkway on a nearly 27-acre plot, this facility received county approval in September 2022. The estimated cost for LC4's construction was $1 billion.
2.91 miles Deft: DRT-IAD1
2.91 miles 43830 Devin Shafron (Bldg F)
2.91 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
2.92 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
2.93 miles JK Land: Technology Park 3 To create an industrial park, JK Land Holdings has proposed rezoning 21.23 acres from Rural Commercial to Planned Development.
2.95 miles 43790 Devin Shafron (Bldg E)
2.96 miles CloudHQ: LC8 CloudHQ plans to invest $400 million in building a three-story facility totaling 805,600 square feet on its Ashburn Data Center Campus. LC8 will be located adjacent to CloudHQ's LC4 facility at 22200 Loudoun County Parkway.
2.96 miles QTS Ashburn Lockridge QTS Lockridge ASH2 hyperscale campus is located in Sterling, Virginia. Comprising two bookend buildings on a tight infill site, the two-story single-use facilities span a 28-acre campus.
2.96 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
2.97 miles Stack: Northern Virginia NVA04 Stack Infrastructure's 80-acre NVA04 campus offers plans for three buildings totaling nearly 1 million sq. ft.
3.00 miles CloudHQ: LC10 The Data Center building referred to as LC10 will be a part of CloudHQ's Ashburn Data Center Campus located at 22210 Loudoun County Parkway, Ashburn.
3.01 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
3.02 miles Hiddenwood Assemblage Campus The Loudoun County Planning Commission recommends approving a proposal allowing Arcola homeowners to sell their land for a data center project.
3.02 miles JK Land: Technology Park 2 Approved in 2022, the 869,000-square-foot JK Technology Park 2 is slated for construction directly south of the subdivision.
3.02 miles JK Land: Tech Park 1 Expansion
3.04 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) Amazon Data Services Inc. recently acquired a 24.6-acre property at 44150 Wade Drive in Chantilly from Firefox LLC for $34.44 million.
3.04 miles CloudHQ: LC12 The Data Center building referred to as LC12 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
3.04 miles CloudHQ: LC9 The Data Center building referred to as LC9 will be a part of CloudHQ's Ashburn Data Center Campus located at 22210 Loudoun County Parkway, Ashburn.
3.05 miles CloudHQ: LC13 The Data Center building referred to as LC13 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
3.06 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
3.06 miles Stack: NVA04B This facility is part of Stack Infrastructure's 80-acre NVA04 campus in Northern Virginia.
3.06 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
3.09 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
3.10 miles JK Land: Technology Park 1 In 2020, supervisors approved the 3-million-square-foot JK Technology Park 1, owned by JK Land Holdings, which borders Briarfield Estates to the north.
3.10 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
3.11 miles Stack: NVA04C This facility is part of Stack Infrastructure's 80-acre NVA04 campus in Northern Virginia.
3.12 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
3.13 miles CloudHQ: LC14 The Data Center building referred to as LC14 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
3.14 miles CloudHQ: LC11 The Data Center building referred to as LC11 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
3.15 miles Prologis: Executive Drive The Loudoun County Planning Commission has voted to recommend the approval of a new Prologis data center in Sterling, Virginia.
3.16 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
3.16 miles QTS Ashburn-Moran QTS acquired this site via the Carpathia acquisition in 2015 and was previously known as "QTS Dulles (The Vault)"
3.18 miles Prologis: Global Plaza Rd Prologis is seeking to convert existing warehouses into data centers in Sterling, Virginia, and expand their capacity.
3.19 miles QTS Ashburn (Carpathia) QTS acquired this site via the Carpathia acquisition in 2015
3.20 miles Aligned IAD03 Aligned IAD-03 is Aligned's third data center in Northern Virginia and first in Sterling. The four-story hyper-scale data center building offers 72MW across 430,000 sq ft (40,000 sq m).
3.21 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
3.22 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
3.25 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
3.25 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
3.26 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
3.27 miles Yondr: Arcola Expansion Yondr is planning to expand capacity on an adjacent parcel of land.
3.27 miles EdgeCore: Ashburn AS02 EdgeCore Digital Infrastructure is teaming up with Washington, D.C.-based developer Penzance on a new 260,000-square-foot data center on 7.6 acres at 1501 Moran Road in Sterling, Virginia.
3.28 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
3.32 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
3.32 miles Yondr Arcola, VA Yondr Group's Project Allegro South Campus is located in Loudoun County, Virginia. The company started construction on the facility in 2022, and the first phase became operational in 2024.
3.33 miles 44372 Round Table: Digital Realty
3.34 miles CloudHQ: LC5 The Data Center building referred to as LC5 will be a part of CloudHQ's Ashburn Data Center Campus located at 21615 Lockridge Rd, Ashburn.
3.36 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
3.38 miles Yondr Arcola Bldg 2 In February 2024, Yondr Group started construction on a second building at its Loudoun County data center campus in Virginia.
3.38 miles Digital Realty: IAD43
3.38 miles 44274 Round Table (Bldg L)
3.38 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
3.42 miles Aligned IAD02 Aligned IAD-02 is the second building on Aligned's 26-acre campus in Ashburn, VA located at 21821 Uunet Dr. The facility has a 120 MW capacity.
3.42 miles Regency DC Campus Ashburn The Regency data center project is a proposed hyperscale campus situated on 130 acres at the intersection of Waxpool Road and Ashburn Village Boulevard in Ashburn, Virginia.
3.43 miles QTS Ashburn 1 There is 2.66 MW of Critical Power per Data Hall
3.44 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
3.47 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) Amazon Web Services (AWS) is constructing a massive data center campus spanning across three buildings on a 90-acre site located at 42139 Reeds Farm Lane, southwest of Dulles International Airport.
3.48 miles Dulles 2000 Campus BlackChamber Group's proposed development includes two data center buildings, totaling 530,000 square feet with a 0.44 floor area ratio.
3.51 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
3.52 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
3.52 miles Quantum Connect: Ashburn, VA A data center is under construction at the Quantum business park in Ashburn, Virginia.
3.54 miles Menlo: MD-DC2 (Sterling) Menlo Digital Acquired a 32.2-acre Loudoun County site with an existing office building in June 2024. A four-story 600,742 square foot data center is scheduled for delivery in 2Q28.
3.55 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
3.55 miles Equinix DC13
3.56 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) Amazon Web Services (AWS) is constructing a massive data center campus spanning across three buildings on a 90-acre site located near 41992 John Mosby Highway in the southwestern vicinity of Dulles International Airport.
3.57 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) Microsoft is constructing another single-story data center building known as IAD12 at it's Aldie Campus. The facility will span 148,233 square feet at full build out.
3.60 miles 44751 Round Table (Bldg P)
3.60 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) Microsoft's single-story data center building known as IAD13 at its Aldie Campus spans 102,022 square feet at full build-out.
3.61 miles CloudHQ Ashburn Campus The campus plans to host fourteen data centers with a combined customer critical IT load exceeding 1.7 GW. At full build out, the campus will span an area of 8,500,00 SF (789.676 SM).
3.61 miles PowerHouse: Pacific Bldg C On Sterling’s Pacific Boulevard, PowerHouse Pacific will comprise three three-story buildings totaling 24 data halls across 1.1 million sq ft (102,200 sqm). Construction is due to start in 2024 and complete in 2026/2027.
3.62 miles CloudHQ: LC1B
3.62 miles Vantage VA16
3.63 miles Sabey Intergate.Ashburn (Building A) Sabey Data Centers (SDC) has begun construction on Building A, the third and final building on its Ashburn campus.
3.63 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
3.64 miles Vantage VA15 In July 2025, Vantage completed the topping out of the fifth building at its data center campus in Ashburn, Loudoun County, Virginia.
3.64 miles Sabey: Intergate.Ashburn (Building B)
3.64 miles Digital Realty: Broderick Drive
3.65 miles Aligned Ashburn Aligned IAD-01 is the first building on Aligned's 26-acre campus in Ashburn, VA located at 21890 Uunet Dr. The facility has a 60 MW capacity.
3.66 miles Digital Realty: IAD55 Digital Realty's Digital Sterling project features a three-story building situated on a 22-acre plot at the intersection of Route 28 and Pacific Boulevard in Sterling.
3.67 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) Microsoft's single-story data center building, known as IAD11, is located at 41840 Growth Mindset Ln, Stone Ridge. The facility comprises 244,713 square feet of gross floor area (GFA).
3.67 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
3.68 miles PowerHouse: Pacific Bldg B On Sterling’s Pacific Boulevard, PowerHouse Pacific will comprise three three-story buildings totaling 24 data halls across 1.1 million sq ft (102,200 sqm). Construction is due to start in 2024 and complete in 2026/2027.
3.69 miles DataCanopy: Ashburn 1 DataBank’s IAD1 facility anchors DataCanopy's Ashburn Campus in the heart of “Data Center Alley” – the world’s largest concentration of data centers.
3.71 miles IBM Softlayer Chantilly WDC01
3.71 miles Databank Ashburn IAD1 In December 2020, Databank acquired the site from Zayo.
3.71 miles DataBank Ashburn IAD4 IAD4 and surrounding 5-acres of land will join the two existing facilities (IAD1, IAD3) already in operation on the existing 13-acre campus.
3.71 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
3.72 miles Sabey Intergate.Ashburn Intergate.Ashburn is a purpose-built data center campus on 38 acres
3.72 miles CloudHQ: LC3 Buildings referred to as LC 2 and LC 3 are part of CloudHQ's Ashburn Data Center Campus. These two structures are independent data centers, with each facility surpassing 500,000 square feet in floor space.
3.72 miles FastServ Ashburn
3.72 miles 21744 Sir Timothy Drive (ACC10)
3.75 miles CloudHQ LC2 Buildings referred to as LC 2 and LC 3 are part of CloudHQ's Ashburn Data Center Campus. These two structures are independent data centers, with each facility surpassing 500,000 square feet in floor space.
3.75 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
3.75 miles Lafayette Center Drive Campus - Digital Realty In 2010, DRT acquired this site from 365 Main. The transaction included 4 other data centers and was for a total of $725 Million.
3.77 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
3.78 miles Sentinel: Cloud Plaza, Sterling, VA GI Partners, operating as GI TC Loudoun LLC, finalized the $709 million purchase of the Cloud Plaza data center from Sentinel Ashburn II LLC (Sentinel Data Centers) on May 19, 2022.
3.78 miles CyrusOne Northern Virginia Sterling IV
3.79 miles PowerHouse Pacific On Sterling’s Pacific Boulevard, PowerHouse Pacific will comprise three three-story buildings totaling 24 data halls across 1.1 million sq ft (102,200 sqm). Construction is due to start in 2024 and complete in 2026/2027.
3.80 miles 21745 Sir Timothy (ACC9) Digital Realty
3.80 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) Amazon's third data center building, known as Building C at its Quail Ridge campus, is a two-story data center spanning 275,500 square feet.
3.81 miles Centersquare: IAD2-B
3.81 miles NTT: VA7 Set to open in September 2026, VA7 Data Center in Ashburn will deliver roughly 125,000 square feet of premium data-floor space.
3.84 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) Amazon's fourth data center building, known as Building D at its Quail Ridge campus, is a two-story data center spanning 275,500 square feet.
3.86 miles Centersquare: IAD2-A Cyxtera's DC5 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink.
3.86 miles DataBank Ashburn IAD3
3.86 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) This data center is a part of Amazon's Renaissance Technology Park project in Fairfax County.
3.87 miles NTT: VA6 VA6 is a 180,000-square-foot data center located on NTT's 78-acre campus in Ashburn, Virginia.
3.87 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) Amazon IAD124, also referred to as Building A, is a two-story structure facility with a total area of 206,194 square feet.
3.88 miles Vantage VA12
3.89 miles Vantage VA13
3.90 miles NTT: VA9
3.90 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) This data center is a part of Amazon's Renaissance Technology Park project in Fairfax County.
3.91 miles Vantage VA14
3.91 miles STACK Northern Virginia The Infomart Ashburn site contains up to 6 data halls. Each data hall is 10,000sqft and can handle between 2 and 3 MW each. There is also 10,000 sqft of office space.
3.91 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
3.92 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) Amazon IAD125, also referred to as Building B, is a two-story structure facility with a total area of 206,194 square feet.
3.93 miles Equinix DC21
3.94 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
3.94 miles Vantage Ashburn Campus The first phase of the campus was completed in Q1 of 2019.
3.96 miles NTT VA3 RagingWire's Ashburn VA3 Data Center is phase one of the massive Ashburn Data Center Campus development which can accommodate six buildings on the 76.5 acre site.
3.96 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) The project, Renaissance Technology Park, is set to transform nearly 60 acres of existing warehouse space into a 2.14-million-square-foot data center complex.
3.97 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) Amazon plans to build another data center in Loudoun County.
3.98 miles NTT VA5
3.99 miles Digital Realty: IAD-56 In 2019, Digital Realty acquired the site from aircraft manufacturer Airbus Americas for $28 million
4.00 miles Lightedge: Ashburn LightEdge Ashburn Data Center is a sublisting and tenant within the Equinix DC11 facility.
4.00 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) This data center is a part of Amazon's Renaissance Technology Park project in Fairfax County.
4.01 miles Equinix Ashburn DC6
4.01 miles Equinix Ashburn DC11
4.01 miles Equinix Ashburn DC5
4.02 miles Vantage VA2 Campus On 18.6 acres east of Route 28 in Sterling, Virginia, Vantage Data Centers is developing its VA2 campus.
4.02 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
4.02 miles 21625 Gresham (ACC7) Digital Realty ACC7 is part of the legacy Dupont Fabros Ashburn campus
4.03 miles Equinix Ashburn DC4
4.03 miles Equinix Ashburn DC1
4.03 miles Dulles 28 Technology Park The Dulles 28 Technology Park site encompasses 39.8 acres situated at the northwest quadrant where Waxpool Road meets Pacific Boulevard.
4.05 miles Vantage: VA23 This facility is part of Vantage's Ashburn VA2 Campus in Virginia.
4.05 miles Equinix: DC22 Equinix's DC22 data center is situated within the DC21 campus, and its initial phase provides capacity for 2,125 cabinets.
4.06 miles NTT Ashburn Campus
4.06 miles Vantage: VA22 This facility is part of Vantage's Ashburn VA2 Campus in Virginia.
4.06 miles NTT: VA8
4.07 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
4.08 miles Equinix Ashburn Campus Equinix's Ashburn campus consists of many buildings (table below) arranged in a campus environment. A simple cross-connect will reach any other building on the campus.
4.08 miles Equinix Ashburn DC2 The heart of interconnection in Ashburn
4.09 miles Cologix: Ashburn ASH2 Cologix has acquired 38 acres in Ashburn’s "Data Center Alley" for a new AI-ready interconnection hub.
4.09 miles H5 Ashburn The data center located on Beaumeade Circle will qualify for Virginia data center sales and use tax exemption.
4.11 miles 44480 Hastings (ACC4) Digital Realty ACC4 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
4.11 miles NTT VA4
4.12 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
4.17 miles Cologix Ashburn ASH1 Cologix is planning to construct three data centers totaling nearly 1 million square feet across 22.6 acres at Beaumeade Corporate Park in Ashburn. The company bought the site for $38 million, or $1.68 million per acre, from the Christian Fellowship Church in July 2018.
4.17 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
4.18 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) Located at the heart of Northern Virginia's "Data Center Alley," the $360 million Beaumeade Circle project was developed by Oppidan Investment Company, known for its work with AWS.
4.22 miles Penzance: Chantilly Premier Real estate firm Penzance has commenced construction on a new, three-story data center in Chantilly, Virginia.
4.24 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) Amazon Web Services (AWS) has executed a lease with Penzance and will be responsible for operating and staffing the data center.
4.24 miles 44521 Hastings (ACC5) Digital Realty
4.26 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
4.28 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) This facility is a part of The Beaumeade Circle project developed by an affiliate of Oppidan Investment Company.
4.29 miles Cologix: ASH1-N This facility is part of Cologix ASH1 campus in Ashburn.
4.29 miles 44520 Hastings (ACC3) Digital Realty
4.29 miles Peterson: Silverbrook Peterson Companies plans to construct two data centers in Dulles, Virginia. The data center project will be situated near 22900 Platform Plaza, west of Sully Road and south of S. Sterling Boulevard, in Loudoun County. Dubbed the Silverbrook Project, the company intends to develop two 27,000 sq ft (2,500 sqm) buildings on the currently undeveloped 16-acre site.
4.30 miles Rackspace Ashburn IAD3
4.30 miles 44461 Chilum (ACC6) Digital Realty ACC6 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
4.30 miles Menlo: MD-DC1 (Herndon) Construction on the massive 307,498 sq. ft., two-story data center (acquired in June 2023) kicked off in late 2025.
4.32 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
4.35 miles 44490 Chilum (ACC2): Digital Realty
4.39 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
4.39 miles 44470 Chillum - Digital Realty
4.40 miles Equinix Ashburn DC3 Equinix's DC3 site is logically part of Equinix Ashburn Campus but the building is physically on the Digital Realty campus.
4.41 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) Amazon's Mallory Drive data center campus is located on part of the land it bought at 3980 Virginia Mallory Dr in Chantilly in 2021.
4.43 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
4.43 miles Connect Data Centers: Sterling, VA
4.44 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
4.45 miles PowerHouse ABX1
4.48 miles Dulles 28 Centre Motorplex On August 5, 2021, BlackChamber Group, operating through Dulles 28 Centre Lot 2A LLC, purchased 11 acres of land in Sterling, Loudoun County, Virginia, behind Auto World Circle.
4.48 miles Lumen Ashburn
4.49 miles Cyrusone: Beaumeade Circle CyrusOne acquired PowerHouse ABX-1, located in Ashburn, Loudoun County, for $154.1 million in Virginia. Sat on 10 acres at 21529 Beaumeade Circle, ABX-1 comprises a single two-story 265,000 sq ft (25,000 sqm) building.
4.49 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) Amazon's Mallory Drive data center campus is located on part of the land it bought at 3980 Virginia Mallory Dr in Chantilly in 2021.
4.54 miles Equinix Ashburn DC10 Equinix sells "Business Suites" at DC10. Business Suites are dedicated rooms rather than retail colocation racks and cages and are intended for deployments larger than 250 kVA.
4.56 miles NTT VA1 RagingWire’s patented electrical infrastructure offers 2N+2 redundancy -- twice the redundancy of a standard Tier 3 data center.
4.56 miles Centersquare: Ashburn WDC1 Centersquare's Ashburn facility is in Virginia close to Washington, DC in the heart of Loudon County’s “Data Center Alley” with its multiple fiber routes, and less than 10 miles from Dulles International Airport.
4.56 miles Digital Realty: 21561 Beaumeade Cir In 2010, Digital Realty Trust (DLR) acquired two fully leased data centers in the northern Virginia market, as well as a parcel of land in the heart of Ashburn's "Data Center Alley" that could support future construction.
4.57 miles DataCanopy: Ashburn 2 Data Canopy’s data center located in Ashburn, Virginia, is strategically located near Washington, DC in the area known as, “Fiber Alley,” one of the densest regions of fiber carriers in the world.
4.58 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) Amazon Data Services acquired a 33-acre property known as TransDulles Centre 2 at 45900 Pathfinder Plaza on June 2024 for $135.75 million.
4.58 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
4.58 miles 21710 Charles View
4.59 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) Amazon Data Services acquired a 33-acre property known as TransDulles Centre 2 at 45900 Pathfinder Plaza on June 2024 for $135.75 million.
4.59 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) Amazon Data Services acquired a 33-acre property known as TransDulles Centre 2 at 45900 Pathfinder Plaza on June 2024 for $135.75 million.
4.65 miles NTT VA2
4.66 miles Paragon Park Lot 3B On October 15, 2021, Paragonpark Lot 3B LLC, a subsidiary of BlackChamber Group, purchased 49.7 acres of land in Sterling, Loudoun County, Virginia, for $135 million.
4.67 miles Equinix DC15
4.72 miles Equinix Ashburn DC12 Equinix's DC12 site is logically part of Equinix Ashburn Campus but the building is physically separate and 0.6 miles away.
4.72 miles Equinix DC16
4.74 miles Equinix: DC17 Equinix intends to build its DC-17 data center in Loudoun County, Virginia
4.74 miles 21641 Charles View
4.75 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
4.77 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) AWS operates three data centers at 4100, 4101, and 4155 Westfax Drive, which together comprise 220,800 square feet.
4.77 miles Equinix: DC18 Equinix intends to build its DC-18 data center in Loudoun County, Virginia
4.84 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) AWS operates three data centers at 4100, 4101, and 4155 Westfax Drive, which together comprise 220,800 square feet.
4.85 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
4.86 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
4.87 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) AWS operates three data centers at 4100, 4101, and 4155 Westfax Drive, which together comprise 220,800 square feet.
4.89 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
4.90 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
4.93 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
4.94 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
4.94 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
4.98 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) Amazon Web Services (AWS) is the sole tenant leasing two single-story powered shell data center buildings located on West Severn Way in Sterling, Loudoun County, Virginia. These facilities collectively comprise 297,160 square feet of net rentable square feet (NRSF).
5.03 miles Aptum Herndon The site was originally a Peer 1 site before the Cogeco acquisition.
5.05 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
5.13 miles Washington Commanders: Ashburn, VA The Washington Commanders, via affiliate Scoreboard Landco Borrower LLC, have submitted plans for three data centers on a 34-acre portion of their Ashburn campus.
5.13 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
5.16 miles PointOne: IAD2 Situated on a 9.4-acre site, the property is slated for the development of a two-story, 244,000 sq ft (22,700 sqm) data center, which has already received conditional approval.
5.18 miles DataCanopy: Sterling, VA 62 cabinets available and 225+ kW multi-tenant cages. 40+ cabinet private cage can be segmented.
5.19 miles CyrusOne: Broadlands Boulevard CyrusOne has acquired a plot of land in the Ashburn area of Virginia’s Loudoun County. The company has filed plans to build five two-story data center buildings on the campus.
5.20 miles CyrusOne: Broadlands Expansion
5.23 miles CyrusOne Northern Virginia Sterling V
5.34 miles CyrusOne: NVA7 The NVA7 building is conveniently located only 8 miles away from Dulles International Airport, 35 miles from Washington National Airport, and is close to a variety of hotels and restaurants.
5.48 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
5.56 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
5.67 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
5.68 miles PointOne: Ashburn The campus will have 2 buildings
5.68 miles COPT: 45771 Maries Rd
5.69 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
5.69 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) Amazon's Atlantic Blvd Campus in Sterling consists of three powered shell data center buildings. Blackstone Real Estate Income Trust (BREIT) is the landlord of this site.
5.70 miles COPT: 45761 Maries Rd
5.73 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) Amazon's Atlantic Blvd Campus in Sterling consists of three powered shell data center buildings. Blackstone Real Estate Income Trust (BREIT) is the landlord of this site.
5.75 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
5.78 miles CyrusOne Sterling VIII
5.78 miles EdgeCore Ashburn EdgeCore has completed the topping out of a data center at 45865 Maries Road, Sterling, VA. The Maries Road location will offer 348,000 sq ft of space.
5.81 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) Amazon's Atlantic Blvd Campus in Sterling consists of three powered shell data center buildings. Blackstone Real Estate Income Trust (BREIT) is the landlord of this site.
5.83 miles Lincoln Rackhouse 251 Exchange The site also houses a Verizon CO and was formerly Level3 site known as Herndon 2, but Level3 has since moved out.
5.83 miles Lumen Herndon 1
5.84 miles Lumen Herndon 3
5.84 miles Centersquare: Sterling DC3 Cyxtera's DC3 site in Sterling was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink. The transaction which closed in May 2017 created Cyxtera Technologies.
5.89 miles Centersquare: Sterling DC2
5.90 miles Cogent: 510 Huntmar Cogent exited the data center and it is currently available to lease.
5.96 miles CyrusOne Northern Virginia Sterling I, II, III
5.98 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) Amazon Data Services has filed plans with Loudoun County to demolish and replace nine office buildings across three sites in Sterling with four data centers spanning more than 900,000 square feet (83,600 sqm) between them.
5.99 miles 21110 Ridgetop The site is fully leased to triple net tenants.
5.99 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
6.00 miles Centersquare: Sterling DC4
6.03 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) Amazon Data Services has filed plans with Loudoun County to demolish and replace nine office buildings across three sites in Sterling with four data centers spanning more than 900,000 square feet (83,600 sqm) between them.
6.04 miles Corscale: Kincora Corscale is planning a second Virginia development in the Kincora area of Sterling in Loudoun County. Sat on a 22-acre site, the company is planning a single 500,000 sq ft (46,450 sqm) building, consisting of eight data halls across three stories.
6.09 miles H5: Herndon
6.11 miles Active Infra: Spring Valley Expansion
6.11 miles Active Infra: Spring Valley Tech Park Active Infrastructure plans to develop a 3.5 million-square-foot (325,161 sqm) data center campus on 362 acres in Leesburg, Loudoun County, Virginia.
6.14 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) Amazon Data Services has filed plans with Loudoun County to demolish and replace nine office buildings across three sites in Sterling with four data centers spanning more than 900,000 square feet (83,600 sqm) between them.
6.16 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) Amazon Data Services has filed plans with Loudoun County to demolish and replace nine office buildings across three sites in Sterling with four data centers spanning more than 900,000 square feet (83,600 sqm) between them.
6.16 miles Compass Loudoun County
6.29 miles Parkstone Tech Park
6.44 miles CoreSite Reston VA3 CoreSite is developing another 12,000 sq ft (1,115 sqm) data hall on the VA3 site, scheduled for completion in 2025.
6.49 miles Farkas Family: Leesburg, VA The Farkas family, represented by law firm Curata Partners, has submitted a pre-meeting application to rezone approximately 87 acres at Holyfield Farm outside Leesburg, Virginia, from transitional residential to an industrial park.
6.52 miles Visa Eastern US Ashburn Visa completed its new 350,000 square foot data center in October 2008. The Tier IV property features five data center pods of 30,000 sf each
6.74 miles Luck Stone: Ashburn Expansion
6.79 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
6.79 miles CoreSite Reston Campus VA1 CoreSite’s Reston data center (VA1) is part of the Reston campus that is comprised of more than 1.3 million square feet of colocation space upon full build-out.
6.79 miles Contegix Reston The Contegix site is on CoreSite's Reston Campus
6.81 miles CoreSite VA2
6.84 miles Luck Stone: Ashburn Virginia-based quarry company Luck Stone Corp. is planning to develop up to 2 million square feet (185,800 sqm) of new data center space in the Ashburn area of Loudoun County.
6.95 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
7.01 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
7.06 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
7.16 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
7.21 miles JK Land: Ashburn JK Land Holdings is planning to develop a 360,000 sq ft (33,445 sq m), two-story data center on a 25-acre site located at 19886 Ashburn Road near Route 7 in Ashburn, Virginia.
7.25 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) The campus consists of five buildings, with a total of 1.9 million-square-feet.
7.26 miles JK Land: Greenlin Park JK Land Holdings got approval to build 2.1 million sq ft (195,096 sq m) of data center and utility substation space on an 81-acre parcel between Sycolin Road and Dulles Greenway.
7.41 miles JK Land: Greenlin Expansion
7.74 miles Belmont Innovation Campus SDC Capital Partners, through Loudoun GC, received board approval to build a 1.3 million square feet (120,774 sqm) data center on a 112-acre site situated between Belmont Ridge Road and Goose Creek, just south of Route 7.
7.74 miles JK Land: Cross Mill Center A proposal by JK Land Holdings for a new data center in Leesburg, Virginia, has been approved.
7.84 miles SDC Capital: Twin Creeks SDC Capital Partners has completed a massive land acquisition in Loudoun County, Virginia, for data center development.
7.86 miles JK Land: Freedom Trail Rd The site, originally planned for 1,300 residential units, includes a prior proposal for two data centers totaling 1.1 million sq ft. JK Land Holdings' specific development plans are not yet confirmed.
7.96 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
7.99 miles Vantage: VA32 This facility is a part of Vantage's VA3 data center campus in Ashburn.
8.05 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
8.07 miles Vantage: VA33 This facility is a part of Vantage's VA3 data center campus in Ashburn.
8.13 miles Vantage: VA35 This facility is a part of Vantage's VA3 data center campus in Ashburn.
8.15 miles Vantage VA3 Campus Located on 134 acres, the campus will feature seven multi-story facilities with 288MW of capacity across more than 2 million square feet.
8.17 miles Vantage: VA34 This facility is a part of Vantage's VA3 data center campus in Ashburn.
8.26 miles Vantage: VA37 This facility is a part of Vantage's VA3 data center campus in Ashburn.
8.29 miles Tuscarora Crossing Campus BlackChamber Group plans to develop 701,400 square feet of data center space across three two-story buildings in Leesburg, Virginia.
8.29 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) Microsoft's two data center buildings, known as IAD02 and IAD03, sit on a portion of the roughly 323 acres Microsoft acquired from the Peterson Cos. in 2018 for $73 million.
8.32 miles Vantage: VA36 This facility is a part of Vantage's VA3 data center campus in Ashburn.
8.33 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) Microsoft's two data center buildings, known as IAD02 and IAD03, sit on a portion of the roughly 323 acres Microsoft acquired from the Peterson Cos. in 2018 for $73 million.
8.51 miles Lincoln Rackhouse 1807 Michael Faraday The facility was constructed in 1982 and was fully renovated in 2008, 1807 Michael Faraday Court is a single-story data center located approximately 20 miles west of Washington, DC and 15 miles east of Ashburn, VA.
8.69 miles Evocative: Virginia, IAD1 Evocative's Virginia Data Center Facility (IAD1) is located at 1807 Michael Faraday Ct, Reston, VA. The facility offers 25,000 sq ft (2,322 sq m) of total floor space and a maximum power capacity of 2.2MW.
8.72 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) Microsoft's Leesburg campus is located next to the Leesburg Executive Airport. The facilities, known as IAD01-1 and IAD01-2, together comprise more than 245,000 sq ft (22,750 sq m).
8.73 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) Microsoft's Leesburg campus is located next to the Leesburg Executive Airport. The facilities, known as IAD01-1 and IAD01-2, together comprise more than 245,000 sq ft (22,750 sq m).
8.75 miles Springfield East: Leesburg, VA Springfield East and Kettler Inc. have proposed a 200,000 to 250,000 square-foot data center and substation on a 33.77-acre parcel at Golf Club Road and Russell Branch Parkway SE.
8.80 miles 1780 Business Center Drive (VA3) Digital Realty This site was originally operated by Dupont Fabros as VA3 before being acquired in Sept 2017 by Digital Realty
8.93 miles QTS: Prince William Digital Gateway Campus A judicial ruling voided the massive Digital Gateway data center project, but the developers and county are appealing the decision, leaving the 1.7-gigawatt plan in doubt.
9.04 miles Stack: NVA06B Data center firm Stack Infrastructure announced a new campus in Leesburg. Known as NVA-06, the 32-acre site will host two data center buildings of around 620,000 sq ft (57,600 sqm) of space.
9.20 miles Stack: Northern Virginia, NVA06 Data center firm Stack Infrastructure announced a new campus in Leesburg. Known as NVA-06, the 32-acre site will host two data center buildings of around 620,000 sq ft (57,600 sqm) of space.
9.77 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
10.16 miles Peterson: Leesburg Gateway Campus Peterson Companies, through its affiliate Leesburg Gateway, LLC, is proposing a significant data center and industrial development on a 100-acre site in Leesburg, Virginia.
10.35 miles Compass: Prince William Digital Gateway Campus A judicial ruling voided the massive Digital Gateway data center project, but the developers and county are appealing the decision, leaving the 1.7-gigawatt plan in doubt.
10.95 miles Verizon: 7777 Infantry Ridge Former AOL data center
11.06 miles Equinix Manassas DC14
11.49 miles Aligned: Manassas, VA In 2022, Aligned acquired this plot in Manassas, Virginia.
11.53 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) Microsoft acquired the 46 acre plot in 2020 for $29 million. The plans call for new construction of two - three-story data center buildings.
11.57 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) Microsoft intends to construct two 3-story data center buildings, known as MNZ01 and MNZ02, which will comprise 623,360 square feet. Microsoft acquired the 46 acre plot in 2020 for $29 million.
11.74 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair of parcels comprises around 27 acres at 7151 and 7350 Century Park Drive.
11.86 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair of parcels comprises around 27 acres at 7151 and 7350 Century Park Drive.
12.01 miles CorScale: Gainesville 5 The data center building 4 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville. The two-story data center will offer 200,000 sq ft of data hall space.
12.04 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) Amazon acquired the 10 acres property in June of 2018. Development plans are unknown
12.10 miles CorScale: Gainesville 4 The data center building 4 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville. The two-story data center will offer 200,000 sq ft of data hall space.
12.11 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
12.12 miles Corscale: Gainesville Crossing The first building of this multi-phase development was originally scheduled to open in 2023 but came online in 2025. It is a two-story building with eight (8) data halls and office space totaling approximately 483,000 square feet.
12.18 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
12.19 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
12.19 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
12.25 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
12.29 miles CorScale: Gainesville 3 The data center building 3 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville.
12.29 miles CorScale: Gainesville 2 In Q1 2024, US data center firm CorScale has started work on the second facility at its Gainesville campus in Virginia's Prince William County.
12.33 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
12.53 miles Iron Mountain: Manassas Point Iron Mountain plans to build two data center buildings and a new electricity substation on a 40-acre data center-zoned property in Manassas, VA.
12.65 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) The campus will include four data center buildings, an electric substation, auxiliary equipment structures, and a small administrative building.
12.66 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) This planned facility is part of Google's Bristow Campus in Prince William County, Virginia.
12.70 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) Microsoft Corp. recently acquired 124 acres across two parcels at 13490 University Blvd. and 5941 Wellington Road. University Boulevard site is seeking an allowance for up to nearly 4 million square feet of data centers and a new electric substation.
12.70 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
12.73 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
12.74 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) Microsoft Corp. recently acquired 124 acres across two parcels at 13490 University Blvd. and 5941 Wellington Road. University Boulevard site is seeking an allowance for up to nearly 4 million square feet of data centers and a new electric substation.
12.84 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
12.87 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) This planned facility is part of Google's Bristow Campus in Prince William County, Virginia.
12.87 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
12.88 miles John Marshall Commons Tech Park CTP-II LLC plans to rezone 22.72 acres at the intersection of Catharpin Road and John Marshall Highway from business and light industrial to office mid-rise to construct the data center.
12.88 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) Amazon had plans for a massive data center campus in Manassas, Virginia, but in December 2022, the company decided to pause the plans after county staff recommended the denial of the project.
12.90 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
12.94 miles NTT: VA13 VA13 will be the fourth building of NTT's Gainesville Data Center Campus. The campus is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
12.95 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
12.95 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) AWS has proposed the site for a 2.2 million sqft data center campus on approximately 117 acres.
12.95 miles NTT: VA12 VA12 will be the third building of NTT's Gainesville Data Center Campus. The site is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
12.95 miles NTT: VA11 VA10 DC2 will be the second building of NTT's Gainesville Data Center Campus. The campus is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
12.96 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
12.96 miles NTT Gainesville VA Campus NTT is building four (4) two-story data centers and associated infrastructure on around 104 acres. The site is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
12.96 miles BlackChamber: Gainesville, VA The Merrifield Garden Center in Gainesville, VA (Prince William County), has been sold for $160M to data center developer BlackChamber Group.
12.97 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
12.99 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair comprises two lots totaling 113 acres at 8401 and 8501 Vulcan Lane
13.00 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
13.11 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) The Village Place Technology Park project comprises four two-story data centers, ranging from 114,330 sq ft to 132,750 sq ft, built on the site.
13.11 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) This planned facility is part of Google's Bristow Campus in Prince William County, Virginia.
13.11 miles Iron Mountain Northern Virginia (Manassas) Announced in March 2016, Iron Mountain’s Manassas data center in Prince William County will include four buildings totaling 915,000 square feet and 60 MW of power. The campus is 83 acres.
VA-1, the first building on the campus, is a 165,000Sqft facility with 12.4 MW of power.
13.14 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) The Village Place Technology Park project comprises four two-story data centers, ranging from 114,330 sq ft to 132,750 sq ft, built on the site.
13.16 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) The Village Place Technology Park project comprises four two-story data centers, ranging from 114,330 sq ft to 132,750 sq ft, built on the site.
13.17 miles Iron Mountain VA-2
13.20 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) Amazon Data Services has expanded its footprint in Northern Virginia’s hyper-competitive data center corridor with a $120 million acquisition of 44 contiguous acres in Manassas, Prince William County.
13.20 miles Iron Mountain: VA-7 The Iron Mountain VA-7 data center is a $100 million project housed in a single building (also known as Iron Mountain DC2) on a 24-acre plot.
13.23 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) The Village Place Technology Park project comprises four two-story data centers, ranging from 114,330 sq ft to 132,750 sq ft, built on the site.
13.23 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) Although the Planning Commission recommended its denial, Amazon Web Services (AWS) withdrew the proposal from the October 22 Board of County Supervisors agenda to allow for further community engagement and feedback.
13.24 miles Iron Mountain: VA-3 Iron Mountain continues to grow it's Virginia campus. VA3 is the third and largest building on the Virginia campus over 165,000 sqft and includes two 48 MW data center halls at 30,000 SF each.
13.26 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
13.27 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
13.28 miles Iron Mountain: VA-4 Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA4 is the fourth building on the Virginia campus over 165,000 sqft of space. The facility will house 32 MW of critical load on completion.
13.29 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
13.31 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
13.33 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair comprises two lots totaling 113 acres at 8401 and 8501 Vulcan Lane.
13.35 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) Microsoft Corporation owns 83 acres of land located at 8008 Devlin Road in Bristow, Prince William County, Virginia, on which it is developing a multi-phase data center campus.
13.36 miles Opus Interactive Manassas
13.37 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
13.37 miles Gardner Property Project A developer files plans for an 82-acre data center campus on the site of the Hillwood Camping Park in Gainesville.
13.37 miles Iron Mountain: VA-5 Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA5 is the fifth building on the Virginia campus over 165,000 sqft of space. The facility will house 40 MW of critical load on completion.
13.44 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
13.53 miles Iron Mountain: VA-8 Iron Mountain Data Center seeks to expand its Manassas campus with a new two-story building totaling 165,428 square feet (15,369 square meters).
13.65 miles Equinix Vienna DC8
13.72 miles Iron Mountain: VA-6 VA-6 is one of nine planned data centers situated on a 142-acre, highly secure campus that provides 2,100,000 sq. ft. of highly efficient, green colocation space. VA-6 offers 230,000 gross sq. ft. of space.
13.73 miles Stack: NVA05D The purpose-built facility will have a total footprint of 364,998 SF upon completion and is expected to significantly enhance the company's data center capacity in the area.
13.80 miles Yondr Bristow Campus Yondr Group's Bristow Data Center Campus is located at 12981 Rollins Ford Rd, Bristow. The two-building campus is set to deliver critical cloud capacity in one of the world’s largest data center markets.
13.82 miles TPC: Manassas, VA
13.94 miles Stack: NVA05B STACK Infrastructure is constructing a new data center facility at9001 Freedom Center Blvd, Building B in Manassas, with a substantial footprint of 340000 square feet.
13.95 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) A proposed 389,425 square-foot data center development is planned for the Brentsville Magisterial District.
13.97 miles Yondr: Bristow Bldg 2 Yondr Group's Bristow Data Center Campus is located at 12981 Rollins Ford Road, Bristow, VA.
13.98 miles Stack: NVA05C STACK Infrastructure announced plans to construct a new facility on Wellington Road in Manassas. The purpose-built facility will have a total footprint of 176,276 SF upon completion.
13.98 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
14.06 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
14.10 miles 8217 Linton Hall (VA4) Digital Realty
14.14 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
14.19 miles Stack: Northern Virginia NVA05 STACK Infrastructure's NVA05A data center offers 36MW of flexible capacity within its 262,000 sq. ft. building in Northern Virginia.
14.38 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
14.38 miles JK Land: Hunter Trust JK Land Holdings has submitted a site plan for a property within the Data Center Overlay, allowing for buildings up to 75 feet in height.
14.43 miles QTS Manassas DC5 This facility is part of QTS Data Center Campus in Manassas.
14.47 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) Amazon Data Services acquired the 269-acre site of the planned Devlin Technology Park in Prince William County, Bristow, in late 2025.
14.50 miles QTS: Manassas DC3 This facility is part of QTS Data Center Campus in Manassas.
14.53 miles Cogent Vienna
14.54 miles JK Land: Comcast Center The property, which spans 17 acres, features an existing 108,000-square-foot building that previously served as both office space and a data center.
14.55 miles QTS Manassas DC1 QTS is building a 100+ acre campus in Manassas, Virginia. QTS bought the property, at 10680 University Blvd. adjacent to its existing data center, for $5 million in 2018.
14.55 miles QTS: Manassas DC2 This facility is part of QTS Data Center Campus in Manassas.
14.59 miles 8100 Boone - Digital Realty
14.67 miles QTS: Manassas DC4
14.69 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) Amazon Web Services (AWS) is planning another data center campus in the Manassas area of Virginia's Prince William County. Construction has begun on the Amazon Web Services three-building, approximately 250,000-square-foot data center complex.
14.72 miles QTS Manassas DC6 This facility is part of QTS Manassas 1 Campus in Virginia.
14.85 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) This facility is part of Amazon's Nokesville Road campus in Manassas, Virginia.
14.86 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) Amazon IAD-104 data center is located at 9680 Innovation Dr, Manassas, VA 20110, USA.
14.90 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) Amazon IAD-105 data center is located at 9700 Innovation Dr, Manassas, VA 20110, USA.
14.93 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) This facility is part of Amazon's Nokesville Road campus in Manassas, Virginia.
14.96 miles Equinix Vienna DC7
14.96 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) Amazon IAD-106 data center is located at 9720 Innovation Dr, Manassas, VA 20110, USA.
14.97 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) Amazon is building another data center in it's Innovation Drive campus.
15.00 miles Element Critical VA1
15.02 miles VAZATA Northern Virginia (NoVa One)
15.02 miles CloudHQ Manassas Hornbaker Built in 2010, The site was previously known as COPT-6. There is a 100,000 SF raised floor data area, divisible in bays of 6,250 SF
15.02 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
15.02 miles Evoswitch USA WDC 1
15.03 miles Stack: NVA02G This facility is part of Stack's NVA02 Campus in Northern Virginia.
15.11 miles Stack: NVA02D STACK Infrastructure NVA02D, Building D of NVA02 Campus, is located at Hornbaker Road in Manassas.
15.16 miles DataBank McLean IAD2 In 2020, DataBank acquired the site from zColo.
15.18 miles Stack: NVA02C The facility has a substantial footprint of 15,000 square feet, encompassing both critical and non-critical spaces.
15.20 miles Stack: NVA02E STACK Infrastructure's NVA02E, Building E of NVA02 Campus, is located at Hornbaker Road in Manassas. The data center spans a substantial footprint of 280,000 square feet, encompassing both critical and non-critical spaces.
15.22 miles Lumen McLean 1
15.24 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
15.25 miles Stack: NVA02B STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building B in Manassas with a substantial footprint of 227,000 square feet.
15.26 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html)
15.33 miles Stack: NVA02F This facility is part of Stack's NVA02 Campus in Northern Virginia.
15.33 miles Stack: Northern Virginia, NVA02 Data center firm Stack Infrastructure isData center firm STACK Infrastructure's NVA02 campus in Prince William County will house at least seven data centers, offering 420MW of power capacity for scalability.
15.36 miles Digital Realty: 9905 Godwin A company known as Digital Second Manassas LLC developed a 185,000 sq ft data center at 9905 Godwin Drive in Manassas. Digital Second Manassas is a listed subsidiary of Digital Realty.
15.40 miles Stack: NVA02I This facility is part of Stack's NVA02 Campus in Northern Virginia.
15.45 miles Stack: NVA02H This facility is part of Stack's NVA02 Campus in Northern Virginia.
15.54 miles Digital Realty: IAD50
15.54 miles Stack: NVA02J This facility is part of Stack's NVA02 Campus in Northern Virginia.
15.58 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) The IAD-103 data center building is part of Amazon's Tanner Way Campus in Manassas, VA. The one-story building consists of 18 backup diesel generators with 84 exhaust fans.
15.61 miles Digital Realty: IAD51
15.69 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) The IAD-101 data center building is part of Amazon's Tanner Way Campus in Manassas, VA. The one-story building consists of 22 backup diesel generators with 124 exhaust fans.
15.71 miles Stack: Bristow 2 (NVA02L) Prince William County supervisors have voted to reject STACK Infrastructure’s proposal for the Bristow Campus, a large-scale data center project.
15.71 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) The IAD-102 data center building is part of Amazon's Tanner Way Campus in Manassas, VA. The one-story building consists of 26 backup diesel generators with 124 exhaust fans.
15.80 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) Amazon's Tanner Way Campus in Manassas comprises four single-story data center buildings, spanning a total of 795,191 square feet.
15.82 miles [Hyperscale Data CenterRequest Dataset](/content/services/datasets "Request Dataset"/index.html) Amazon has acquired a plot of government-owned land, approximately 20 acres on Wakeman Drive, Manassas, in Virginia's Prince William County for a new data center.
15.82 miles CloudHQ: MDC3 CloudHQ is constructing a three-building data center campus in the heart of the Manassas data center market, just south of the intersection of Routes 28 and 234.
15.87 miles Stack: Bristow Campus (NVA02K) Stack Infrastructure planned to build a large-scale data center campus on a 58-acre site in Bristow, but Prince William County supervisors voted to reject STACK Infrastructure’s proposed Bristow Campus.
15.92 miles CloudHQ: MDC2 CloudHQ is constructing a three-building data center campus in the heart of the Manassas data center market, just south of the intersection of Routes 28 and 234.
16.02 miles CloudHQ: Manassas MDC Campus CloudHQ is constructing a three-building data center campus in the heart of the Manassas data center market, just south of the intersection of Routes 28 and 234.
16.55 miles CloudHQ MCC2 MCC2 is part of CloudHQ's series of data centers in Manassas, Northern Virginia. The facility, with 250,144 sq ft of gross space, came online in 2019.
16.58 miles CloudHQ: MCC7 MCC7 will be part of CloudHQ's MCC Campus in Manassas. The facility is slated to begin construction in mid-2025 with an expected ready-for-service delivery in Q3 2026.
16.76 miles Data Center Edge District The House family has submitted an application to modify their property's designation in the county's Comprehensive Plan from agricultural estate to the proposed Data Center Edge District (DCED).
16.79 miles CloudHQ: MCC5 MCC5 will be part of CloudHQ's MCC Campus in Manassas. The project has received site plan approval and is ready for immediate development in 2024. The data center will span 369,600 sq ft of space.
16.85 miles CloudHQ: MCC4 CloudHQ has announced plans for MCC4, a new facility to be located at 10849 Airman Avenue in the Northern Virginia market. The data center will span 225,585 sqft of space.
16.97 miles CloudHQ Manassas MCC1 CloudHQ's Manassas Corporate Center (MCC) is a 100-acre, 2,232,875 SF (207,441 SM) data center campus.
17.06 miles CloudHQ: MCC6Z MCC6Z will be a part of CloudHQ's MCC Campus in Manassas. MCC6 site consists of two data center buildings, MCC6A and MCC6Z.
17.10 miles CloudHQ: MCC6A MCC6A is part of CloudHQ's MCC Campus in Manassas. This data center became operational in 2022.
17.19 miles CloudHQ MCC3 CloudHQ MCC3 is a part of The MCC data center campus.
17.47 miles CyrusOne: Vint Hill CyrusOne LLC, a data center developer and operator, submitted its first site plan to the county in March for an 870,000-square-foot data center campus.
17.87 miles OVH US East Vint Hill This facility, situated on the grounds of a former Army base in Vint Hill, became OVHcloud's first U.S. data center and officially began operations in 2017.
17.91 miles OVH: Vint Hill Bldg 2 OVHcloud currently plans an expansion of its existing data center, which currently calls the Vint Hill Business Park home.
18.37 miles Vint Hill Corners The Vint Hill Corners data center campus proposal, submitted by a company called Vint Hill Corners LLC, which owns about 80 acres on Brookside Parkway, seeks to develop two one-story data centers on about 50 acres of property at 4295 Aiken Drive in Vint Hill.

424-Acre Lot to the West of Dulles Airport

Source: CBRE

MWAA Aerial View of 424-Acre Parcel

Source: Metropolitan Washington Airports Authority

Ashburn Data Center Cluster Map

Source: Baxtel

Map of data centers immediately surrounding the Equinix campus and Beaumeade Circle.

PreviousNext

Digital Realty Trust is a data center public REIT that owns and operates facilities in the United States and Europe. The company provides colocation and interconnection services and develops large multi‑tenant data centers for enterprise and cloud customers.

Its European platform expanded through the combination with Interxion, and through the purchase of European sites divested by Equinix following Equinix’s acquisition of TelecityGroup. The Telx acquisition added a U.S. interconnection and colocation business to Digital Realty’s portfolio.

Digital Realty Trust History:

  • In March 2020 completed the combination with Interxion, expanding its European platform.
  • In September 2017 completed the merger with DuPont Fabros Technology.
  • In July 2016 acquired eight European data centers from Equinix that were divested as part of Equinix’s TelecityGroup acquisition.
  • In October 2015 completed the acquisition of Telx.
  • On October 28, 2004 priced its initial public offering at 12 dollars per share.

Read more

Digital Realty is planning a new data center in Seattle, Washington, as the city considers a moratorium on new developments. According to BizJournal and other reports, the company has filed plans with the Seattle City Council to replace the existing retail building and parking garage at 301 Virgi...

June 05, 2026

Digital Realty Trust

.webp)

Digital Realty is expanding in Italy with plans to develop a data center campus in Milan.The colocation giant this week announced its entry into the Milan market with the acquisition of two plots in Abbiategrasso, southwest of the city center.The company plans to develop an initial 8MW facilit...

March 24, 2026

Digital Realty Trust

Digital Realty Approved for Sixth Data Center in Marseille, FranceWith server racks at the data center set to require 120kW each, presumably to host AI workloads, Digital Realty plans to install a new high-voltage power supply. This will run from power company RTE’s Realtor substation in Cabri...

March 11, 2026

Digital Realty Trust

Digital Realty has entered Portugal, acquiring a data center in Lisbon. Details on the facility, the seller, and terms of the deal weren’t shared in the release. However, in its recent Q4 2025 results, the company said it had acquired “a building and land” in the Carnaxide area of Lisbon for $...

March 04, 2026

Digital Realty Trust

Digital Realty this week announced the start of construction on FRA20, located at Digital Park Fechenheim. The facility is expected to deliver approximately 16MW of IT capacity across more than 8,100 sqm (87,188 sq ft). The first phase of FRA20 is expected to be operational in spring 2027.“Our...

November 27, 2025

Digital Realty Trust

Read More News

Executive SummaryIn this episode recorded live at PTC 26, Eric Bell speaks with Sharad Agarwal, CEO of Sify Infinit Spaces, the data center arm of Sify Technologies. Sharad Agarwal explains how Sify built India’s first commercial Tier III data center in 20...

Mar 12, 2026

Eric Bell

World

In this episode, we sit down with Cliff Federspiel, President and CTO of Vigilent, to explore how AI driven control systems are reshaping data center cooling, energy use, and operational reliability. Cliff shares his journey from academic research and HVAC controls...

Feb 05, 2026

Eric Bell

World

In this Baxtel Podcast episode, Eric Bell sits down with Wes Cummins, CEO of Applied Digital, to unpack how hyperscale AI data centers are being built far from traditional metros. Wes shares why power availability and fiber routes matter more than population densit...

Jan 15, 2026

Eric Bell

Applied Digital

In this episode, Eric Bell sits down with Russell Fletcher to unpack what it really means to operate a modern power grid in Texas. He is a Russell shares how ERCOT keeps generation and load balanced at 60 Hz, why transmission congestion matters as ...

Jan 05, 2026

Eric Bell

Dallas

Nick Kruse is a chemical engineer turned energy entrepreneur who sits at the nexus of power and compute, and in this episode he explains why behind-the-meter natural gas generation is becoming a long-term strategy for large data centers rather than a temporary brid...

Sep 04, 2025

Eric Bell

Texas

See More Podcasts

DS_Digital_Realty_2023_IAD44_Property_factsheet_EN

Ready to Level up Your Data Center Strategy?

Message Us Book Consultation

We Value Your Privacy

We use cookies to enhance your experience, analyze site performance, and provide personalized content. By clicking 'Accept All', you agree to our use of cookies. You can manage your preferences or learn more by clicking 'Cookie Settings'. Your choices will always be respected.

Accept allReject all

Manage preferences

Privacy Policy

Chat Widget